SUSTAINABLE · ENERGY-EFFICIENT · MODERN

New steel-structure production hall + office building — Inárcs

Inárcs, Pest county · Next to the M5 motorway

4,313 m²
Net building area
3,581 m²
Production hall
14,616 m²
Plot area
2025
Year built — new
10 t
Built-in overhead crane

Green building — sustainable and energy-efficient

The design and building systems support long-term sustainability and efficient operation.

Air-to-water heat pump

Modern electric hot-water-supported system, no gas connection — low operating costs and minimal CO₂ emissions.

Enhanced thermal insulation

Insulated sandwich panel facade and roof, thermally insulated aluminium glazing — stable indoor climate in winter and summer.

Natural daylight

Roof daylight elements in the hall reduce the need for artificial lighting during the day.

Own transformer station

Industrial-capacity power connection with safe supply and expandable performance.

Drilled well for technology water

Dedicated well for technology needs, with fire-water tank and internal fire-water feed installed.

Low maintenance costs

New condition, warranty, and modern building systems mean low maintenance burden in the coming years.

Detailed technical data

Click a category to view the details.

Steel-frame lightweight structure

Main structurePrefabricated steel frame
Facade panelInsulated sandwich panel
Portal glazingThermally insulated portal glass
Internal partitionsDrywall and glass
Roof structureLow-slope rooflight ridge, insulated roof panel
Roof daylightingNatural illumination

Thermal insulation — details

Facade insulationIncreased-thickness sandwich panel
Roof insulationInsulated roof panel, enhanced layer
OpeningsThermally insulated glazing, aluminium frame
Moisture insulationBituminous membrane
FoundationReinforced concrete strip and pad foundation
Construction qualityHigh-standard execution

Area breakdown

Production hall (ground floor)3,580.7 m² — 83%
Office head building (ground floor)367.8 m² — 8.5%
Office head building (upper floor)336.2 m² — 7.8%
Terrace (upper floor)28.7 m² — 0.7%

Video presentation

Gallery

Selected views of the site, production hall, and office areas.

Logistics location

Excellent industrial and logistics position — next to the M5 motorway and close to the M0 ring road.

Inárcs, Szent György street
Google Maps embed goes here

Related distances

M5 motorway junction

~2 km — direct access at km 35

M0 ring road

~20 km — access to the full Budapest metro area

Budapest

~35 km — around 30 minutes via motorway

Budapest Liszt Ferenc Airport

~25 km — international logistics access

Inárcs-Kakucs railway station

Budapest–Lajosmizse railway line

Immediate surroundings — premium services

The M5 service area and the nearby environment provide all essential services.

Fuel

Motorway service area fuel station at M5 km 35 — within 500 m

Dining

Several restaurants, motorway service-area dining, and local catering

Premium accommodation

4-star hotel and wellness hotel in the immediate vicinity

Administration

Healthcare, commercial, and administrative institutions within 500–1500 m

Why choose this property?

New, ready-to-use site

Built in 2025, fully completed, and ready for immediate operation

Energy-efficient

Air-to-water heat pump and enhanced insulation mean low utility costs

10-ton overhead crane

Integrated overhead crane system suitable for heavy industrial production

M5 + M0 junction access

Excellent logistics position — 2 km from M5 and 20 km from M0

Full office + social areas

704 m² office area, kitchens, meeting rooms, changing rooms, and restrooms on both floors

Premium construction quality

Steel lightweight structure, refined finishes, and high construction quality

Contact

Interested in the property?

Request a detailed offer, floor plans, technical documentation, or a personal site visit.